Renovation of the technical installation with 40 SynchroDisks, new stage grid with 10 point hoist track for 37 points, new galleries at different levels in the fly tower, a proscenium grid with electric drives for canopies and fly bars. The steel construction for the stage floor has been completely rebuilt to become the new hub for the 18m (double) stage revolve. The revolve includes a transport lift to move large items between the stage and understage levels. The complete installation of overstage and understage is controlled by the TNM system. Engineering and installation of mechanical and electrical parts were the sole responsibility of Trekwerk.
The installation consists of:
“I would like to express once again that we are very happy to have won Trekwerk as a contract partner after the europe-wide tendering process and that they were allowed to install the new stage machinery for us. The overstage machinery and the revolving stage, which are already very much in use, meet with the approval of all those involved. The ease of use of the control system and the reliability of the system confirm our choice of Trekwerk.”