For the renovation and upgrading of the stage technical installation, the roof was raised by almost 8 meters. Besides the new galleries in four stories, a new lamel-type grid floor with integrated pulley wheels was installed in the fly tower, a new portal bridge with two manteaux towers, and the drive system on the existing iron curtain and two large stage doors are installed. The TNM control system operates the 66 SynchroDisks and 10 SynchroPoint point-hoists, next to the 3 lifts in the revolving stage floor.
The installation consists of:
“In 41 years of theater work I have not encountered a machine engineering system that offers so many possibilities in stage technology for performers. Team Trekwek has a high degree of professionalism in their cooperation, and in their development of speial stage solutions. We are gald that Team Trekwerk is by our side 24/7!”