Deutsches Schauspielhaus Hamburg (2013)

Details

For the renovation and upgrading of the stage technical installation, the roof was raised by almost 8 meters. Besides the new galleries in four stories, a new lamel-type grid floor with integrated pulley wheels was installed in the fly tower, a new portal bridge with two manteaux towers, and the drive system on the existing iron curtain and two large stage doors are installed. The TNM control system operates the 66 SynchroDisks and 10 SynchroPoint point-hoists, next to the 3 lifts in the revolving stage floor.

Specs

The installation consists of:

  • 66 SynchroDisk 700kg winches
  • 10 SynchroPoints500kg
  • Regenerative/Redundant 600VDC Power system.
  • TNM operating system according to EN61508 Sil3
  • Renovation of the existing stage revolve
  • New stage lifts in the revolve

Client

Kirchenallee 39
20099 Hamburg
Germany

Website