Two years earlier Trekwerk replaced the control system of the old Zuidplein theater, now Trekwerk was given the contract to supply the technical installation for the completely new build complex. The work comprises several halls. In the main hall, 77 Synchrodisk winches are installed, a few lineshaft solutions and a new TNM control system, a lamel grid and a modular proscenium framework, and the mainstage has a large orchestra pit lift. In the black box, 23 lineshaft winches are installed and several chain-hoists for flexible rigging. In the surrounding areas, crane beam tracks and chain-hoists are installed to provide standard rigging possibilities to suit the elaborate requirements.
The installation consists of: